12-16 November 2018
Australian Synchrotron
Australia/Melbourne timezone

Eiger 16M integration

14 Nov 2018, 11:20
20m
Oliphant Auditorium (Australian Synchrotron)

Oliphant Auditorium

Australian Synchrotron

800 Blackburn Road 3168 Clayton
Plenary Talk Experiment Control Plenary Talks

Speakers

Dr Mark Clift (ANSTO) Vesna Samardzic-Boban (Australian Synchrotron)

Description

An Eiger 16M detector has been integrated with a new goniometer on the micromolecular beamline at the Australian Synchrotron. The Eiger detector is configured and controlled through EPICS areaDetector. The goniometer is driven using a linear servo amplifier to provide the smoothest possible motion. An oscillation program that coordinates the rotation and shutter has been written to expose user samples. A hardware trigger is provided to the Eiger 16M by the motor control system. Control of the Eiger 16M cover, and monitoring of the necessary N2 supply is achieved by PLC. Sample exposure time has dropped from an average of 15 minutes using the ADSC 335r, down to 1 minute on the Eiger 16M, thereby significantly increasing the science output of the beamline.

Primary authors

Dr Mark Clift (ANSTO) Vesna Samardzic-Boban (Australian Synchrotron)

Presentation Materials

Your browser is out of date!

Update your browser to view this website correctly. Update my browser now

×