Lacy Jones
(ORNL Neutron Sciences Directorate)
29/11/2017, 10:50
The large-scale investment program Science Productivity is a vehicle by which to prioritize, stage, plan and implement requests for directorate funding and resource allocations as Instrument Improvement Projects (IIP) to maintain and improve neutron instrumentation at the neutron facillities at Oak Ridge National Laboratory (ORNL), Spallation Neutron Source (SNS) and High Flux Isotope Reactor...
Dr
Kirrily Rule
(ANSTO)
29/11/2017, 11:10
Project management of instrument builds
Oral Presentation
TAIPAN is the thermal-neutron spectrometer located at the reactor face of Australia’s OPAL reactor (ANSTO). TAIPAN hosts two interchangeable secondary instruments; the triple-axis spectrometer (TAS) and the beryllium-filter spectrometer. The TAS option has been operating since 2010 whilst the Be-filter only began operating in 2015. TAIPAN is renowned for its versatility and high neutron...
Dr
Romuald Hanslik
(Forschungszentrum Juelich GmbH)
29/11/2017, 11:30
Project management of instrument builds
Oral Presentation
The Central Institute of Engineering, Electronics and Analysys ZEA-1 of Forschungszentrum Jülich has been contributing significantly to the development of neutron scattering instruments for the Heinz Maier-Leibnitz Zentrum (MLZ/FRM II reactor) in Garching. These instruments are operated by Jülich Centre for Neutron Science (JCNS).
This talk will present the institute ZEA-1 and project...