Speaker
Kristian Veronika
(ANSTO)
Description
During the 2019 major shutdown, ANSTO has set up a project to remove existing Thermal Neutron Guide (TG1-3) in-pile assembly and replace it with a new in-pile assembly containing an additional TG-2 A/B in-pile guides.
The purpose of this presentation is to provide following:
- Brief description of ANSTO neutron guide configuration;
- Improvements made to enable easier future guide installation /removal
- Provide overall project progress in preparation for the replacement.
Formal Invitation Letter Required | No |
---|
Primary author
Kristian Veronika
(ANSTO)