BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:XAS beamline update
DTSTART;VALUE=DATE-TIME:20141120T051000Z
DTEND;VALUE=DATE-TIME:20141120T055000Z
DTSTAMP;VALUE=DATE-TIME:20260815T125610Z
UID:indico-contribution-199-758@events01.synchrotron.org.au
DESCRIPTION:Speakers: Bernt Johannessen (Australian Synchrotron)\, Chris G
 lover (Australian Synchrotron)\, Kappen Peter (Australian Synchrotron)\, N
 icholas Rae (Australian Synchrotron)\nIn this session we will update on th
 e status of the XAS Beamline\, including developments of the user science 
 program\, status of the 100-element fluorescence detector\, status of Hutc
 h-C\, recent works completed\, and further plans for upgrades and developm
 ents. The session will provide ample opportunity for Q & A and for discuss
 ing science needs that the XAS Beamline is not catering for\, such as the 
 Medium Energy XAS (MEX) Beamline.\n\nhttps://events01.synchrotron.org.au/e
 vent/3/contributions/758/
LOCATION:
URL:https://events01.synchrotron.org.au/event/3/contributions/758/
END:VEVENT
BEGIN:VEVENT
SUMMARY:The XFM beamline: Status\, upgrades and directions\, enabling user
  science across a range of disciplines
DTSTART;VALUE=DATE-TIME:20141120T043000Z
DTEND;VALUE=DATE-TIME:20141120T051000Z
DTSTAMP;VALUE=DATE-TIME:20260815T125610Z
UID:indico-contribution-199-683@events01.synchrotron.org.au
DESCRIPTION:Speakers: Martin de Jonge (Australian Synchrotron)\nThe X-Ray 
 Fluorescence Microscopy beamline has hosted around 250 user groups since i
 t started user operations in 2008\, and sustains high levels of oversubscr
 iption. Armed with the world-leading Maia detector\, and ongoing collabora
 tion with CSIRO\, almost 100\,000 scans have been performed\, representing
  an estimated 100 Gpixels of data and a stage transit of around 200 km wit
 h a positioning accuracy of 2 μm.\nIn order to harness the power of the M
 aia detector\, we have undertaken an ambitious series of upgrades.  This p
 resentation describes the beamline instrumentation with reference to appli
 cations\, and recent upgrades to the table\, scanning stages\, tomography\
 , large-area scanning\, cryogenics\, and configurable specimen mounting st
 ages\, as well as beamline ancillaries including equipment for specimen pr
 e-alignment and cryogenic specimen preparation.  It will then close with a
  short exploration of the future directions for the beamline’s evolution
 .\n\nThis session will include an extended open discussion for XFM users.\
 n\nhttps://events01.synchrotron.org.au/event/3/contributions/683/
LOCATION: NCSS Seminar Room
URL:https://events01.synchrotron.org.au/event/3/contributions/683/
END:VEVENT
END:VCALENDAR
